An improved efficiency combined cycle power plant was provided by Bechtel for the Gilroy Energy Company. This enhancement of cycle efficiency was achieved by eliminating all feedwater heating in order to extract the maximum amount of heat from the Heat Recovery Steam Generator flue gas, resulting in a feedwater temperature of 110° F. A new approach to oxygen control was necessary because the system requires makeup water flow varying from 25 to 85% of condenser outlet flow without the use of a conventional feedwater deaerator. This project confirmed that 02 levels can be controlled to 0.005 cc/liter under severe makeup conditions without chemical additives or the use of a conventional deaerator.

One essential component of this unique design is the combined vacuum deaerator/condenser unit. A second major aspect of the design involves the enhanced venting system. Limited testing prior to startup and operation of the Gilroy Energy power plant indicated that oxygen in the boiler feedwater could be controlled satisfactorily with a total system approach which included both the vacuum deaerator and enhanced venting. Subsequently, further testing of a vacuum deaerator has yielded 02 levels at or below the design requirements of 0.005 cc/liter. Additionally, field test data of 02 levels from the Gilroy Energy plant are presented to verify the successful operation of the condensate oxygen control portion of this cogeneration unit.

PROBLEMS WITH DISSOLVED OXYGEN IN CONDENSERS

With the advent of two-shift and cycling operation of base load power plants, the problem of effective removal of noncondensible gases has increasingly been addressed by both condenser designers and utility end users. Power plants exporting steam for district heating (as well as cogeneration plants) are faced with stringent deaeration problems inherent in introducing large amounts of makeup water saturated with oxygen into the condenser. Any plant requiring deaeration of makeup water exceeding 3 - 5% of the total condenser flow rate (or that is required to remove oxygen from stored condensate on daily restart) must find a method of eliminating oxygen from the water other than introducing it over the condenser tubes.

  For details.....

格雷漢姆(Graham)公司     技術支持:元豐咨詢     蜀ICP備05031754號-2
主站蜘蛛池模板: 国产精品成人久久久久久久| 成人免费视频网站www| 窝窝视频成人影院午夜在线| 亚洲成人免费在线观看| 91啦中文成人| 成人性生话视频| 国产成人免费全部网站| 亚洲人成人一区二区三区| 欧美成人精品第一区二区三区| 成人免费黄网站| 欧美成人精品第一区二区三区| 国产成人无码精品久久二区三区| 久久成人免费播放网站| 国产成人精品免费视频软件| 久久怡红院亚欧成人影院| 成人小视频在线观看| 青青国产成人久久激情911| 国产精品成人va在线播放| 67194成人手机在线| 国产成人精品a视频| 69国产成人综合久久精品91| 国产成人亚洲综合欧美一部| 成人综合激情另类小说| 精品亚洲国产成人| 精品国产成人亚洲午夜福利 | 97超碰精品成人国产| 国产成人AV免费观看| 国产成人精品久久免费动漫| 成人中文精品3d动漫在线| 日本免费成人网| 成人国产精品一级毛片视频| 麻豆成人精品国产免费| 99精品国产成人a∨免费看| 久久成人无码国产免费播放| 亚洲国产精品成人综合久久久| 国产成人天天5g影院| 国产成人免费网站在线观看| 国产成人免费高清激情视频| 国产成人欧美视频在线| 国产成人免费在线观看| 亚洲国产成人久久综合一区|