ABSTRACT

The amount of non-condensible gas contained in a geothermal resource affects the design considerations for an efficient and cost effective power plant. This discussion will be centered on the design considerations for the condenser and hybrid ejector/compressor gas removal system for the Central California Power Agency No. 1. (CCPA No. 1) Coldwater Creek Geothermal Power Plant. The plant design utilizes two 65 MW steam turbine generators with a net output of 116 MW. Plant non-condensible loads are estimated in the range of 1.7-2.2% of total flow.
Each turbine has a 166,000 sq. ft. condenser and each condenser is serviced by three 50% capacity non-condensible gas removal systems. Two of the systems are hybrid steam ejector/centrifugal compressor systems. The third system, for standby use, is a three stage steam ejector.

INTRODUCTION

In preparation for the procurement of equipment for the Coldwater Creek Power Plant, CCPA No. 1, through its engineers, Stone and Webster Engineering, undertook the investigation of alternate technology applications for non-condensible gas removal from steam condensers. After an extensive investigation carried out over several months it was determined that alternate technologies to conventional steam ejectors could be utilized in a cost effective manner. Specifications were prepared which allowed contractors the option of assessing and offering various combinations of technologies.

In the fall of 1984 contractors were invited by CCPA No. 1 to submit economically competitive proposals for furnishing and erecting the main condenser and supply of the gas removal system for the Coldwater Creek Geothermal Plant. The plant consists of three floors and the physical space allocated by CCPA No. 1 for the gas removal equipment is limited to a single bay within the plant 25’0” wide by 300'0" in length. CCPA No. 1 stipulated that any rotary equipment which might be proposed must be placed on the first floor with allowance made for future additional equipment should the plant experience an increase in the non-condensible load at some future date.

  For details.....

格雷漢姆(Graham)公司     技術(shù)支持:元豐咨詢(xún)     蜀ICP備05031754號(hào)-2
主站蜘蛛池模板: 国产成人精品久久综合| 成人毛片18岁女人毛片免费看| 亚洲精品成人av在线| 午夜成人精品福利网站在线观看| 国产成人8X视频网站入口| 国产成人+综合亚洲+天堂| 亚洲国产精品一区二区成人片国内| 免费国产成人午夜在线观看| 精品国产成人亚洲午夜福利| 国内一级毛片成人七仙女| 亚洲国产成人久久综合碰| 成人精品一区二区三区中文字幕 | 色综七七久久成人影| 成人免费漫画在线播放| 久久久久国产成人精品| 国产成人一区二区精品非洲| 粗大黑人巨精大战欧美成人| 免费国产成人手机在线观看| 成人亚洲综合天堂| 日韩国产欧美成人一区二区影院 | 国产精品成人亚洲| 欧美成人秋霞久久AA片| 亚洲精品成人图区| 国产欧美日韩成人| 成人免费淫片在线费观看| 成人理论电影在线观看| 久久亚洲AV成人无码国产| 国产成人一级片| 国产成人www免费人成看片| 无码成人AAAAA毛片| 色综合天天综合网国产成人| 69成人免费视频无码专区| 2021最新国产成人精品视频| 亚洲女成人图区| 亚洲国产成人精品无码区在线网站| 四虎成人精品免费影院| 亚洲精品成人片在线播放| 亚洲依依成人精品| 欧美成人免费观看久久| 成人免费无码大片A毛片抽搐色欲 成人免费无码大片a毛片 | 成人中文字幕在线|